Availability: | |
---|---|
Quantity: | |
HT08
1.Unique big arm structure design
2.The operation front pipeline is clear.
The protective cover protects the pipeline from being destroyed.
3.The boom cylinder adopts the well-known brand
The cylinder is designed integrated, which is more advanced than the welding technology.
4.All structural parts are finely processed.
All structural parts are finely processed.
Shot blasting, pickling, and baking finish process are adopted.
The surface has high gloss and high paint adhesion.
Performance Parameter | |
Rated power | 12HP |
Bucket Capacity | 0.025 m3 |
Engine Model | changchai 192 |
Weight | 650 kg |
Max. digging force | 7.5KN |
Pump form | Single gear pump |
Set working pressure | 14Mpa |
Swing speed | 12 rpm |
Travel speed | 2.2Km/h |
Gradeability | 30° |
Ground pressure | 19Kpa |
Working Range | |
Max. dgging distance | 2450mm |
Max.digging depth | 1200mm |
Max.diging height | 2350mm |
Max.dumping height | 1600mm |
Min.Swing radius | 1100mm |
Max. Upgrade height of blldozer blade | 120mm |
Max. Digging depth of blldozer blade | 200mm |
Dimensions | |
Total width | 720-780mm |
Total height | 1300mm |
Total length | 2430mm |
Min. ground clearance | 80mm |
Track ground length | 1140mm |
Track width | 150mm |
content is empty!